top of page

Tireni's Projects
Milestone 3A

MPI selection of wind turbine for assigned scenario (roof generator)

Materials property chart for each assigned MPI
A software called Granta Chart was used to make the materials property chart


Note: Ranking of materials - Individual, Granta - Individual and team



Consolidation of each material rankings

Narrowing material candidates list to 3 finalists

Criteria ranking for material
This chart was used as a ranking system in order to make deciding which material for the wind turbine easier. Each heading in the first rows and columns were used as the determination factors.

Decision Matrix
The criteria ranking chart above was used to determine the decision matrix chart for the final materials.

Justification for each Material

Summary of chosen material's property

bottom of page